Changes between Version 117 and Version 118 of deliverable09
- Timestamp:
- Jan 20, 2010, 8:06:52 PM (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
deliverable09
v117 v118 73 73 * Paper List 2009 74 74 75 || Deploy Kerrighed SSI massively using DRBL|| [http://event.nchc.org.tw/2009/hpcasia/program/advanced.php#S2C HPC Asia 2009] || 已接受 ||75 || [raw-attachment:deliverable09:Deploy_Kerrighed_SSI_massively_using_DRBL_081223.pdf Deploy Kerrighed SSI massively using DRBL] || [http://event.nchc.org.tw/2009/hpcasia/program/advanced.php#S2C HPC Asia 2009] || 已接受 || 76 76 || E2CC: Building Energy Efficient ClassCloud using DRBL || [http://www.ens-lyon.fr/LIP/RESO/e2gc2/ IEEE Grid 2009 E2GC2 workshop] || 已接受 || 77 77 || Building IDS Log Analysis System on Novel Grid Computing Architecture || [http://wogta2009.cs.nttu.edu.tw/ WoGTA 2009] || 已投稿 ||